    First Assembly School

  First Assembly Christian School, Ft. Myers, Florida

Owner: First Assembly of God
Architect:  Alliance Design Group
Completion Date:  March 2003
Square Footage:  47,500   

This was a construction management project and began with the selection of the design professional.

This is a two story addition to the existing school.  The construction consists of structural precast/pre-stressed slabs and bar joist with metal decking.  The building has a lightweight concrete roof system.  The interior walls are a finish block.

The majority of the building consists of classrooms.  There is a chapel area with a stage and bleachers.  There are also 23 foot high ceilings in the chapel area.